Chatsworth Landscape · Field Guide
Deerlake Ranch · Architectural Committee Review

Every change to your home needs one approval first.

A plain-English guide to the Deerlake Ranch Architectural Guidelines — what the Architectural Committee reviews, what to submit, what’s already pre-approved, and the design standards your project has to meet before a shovel hits the ground.

45Days for
AC review
$150Application
fee
3 setsOf plans
submitted
Read on
Why approval is required

The Committee keeps the whole neighborhood looking like one place.

The Deerlake Ranch Architectural Committee (AC) reviews proposed improvements for aesthetic purposes — to preserve the physical character set by the original construction, keep improvements compatible with one another, and protect everyone’s property value.

That means owners may not make any improvement or alteration visible from the exterior of the residence or yard without first getting written AC approval. The Master Common Property can’t be altered without the Board’s consent either.

AC approval is about appearance only. It does not replace permits — owners are still responsible, at their own expense, for obtaining every required permit and approval from the County of Los Angeles. Government approvals are in addition to, never in lieu of, AC approval.

The golden rule

If it can be seen from outside your home or yard, assume it needs AC approval before you build, plant, paint, or install it.

When in doubt, submit. Building first and asking later can mean modifying or removing the work at your own expense.

New Owner Timeline

The clock starts at close of escrow.

Three deadlines every new Deerlake Ranch owner should put on the calendar the day they get the keys. All timeframes run from the close-of-escrow (COE) date.

90
Days from COE

Window coverings

Install acceptable window coverings within ninety days of closing — uniform, neutral color, no foil, sheets, or newspaper.

60
Days from COE

Submit yard plans

You have sixty days to submit plans for side & rear yard landscaping to the Architectural Committee.

6
Months from COE

Complete the yards

Side & rear yard work must be finished within six months of close of escrow.

The Approval Process

From application to approval, step by step.

Every submittal travels the same path. Knowing the route is the easiest way to get approved on the first pass.

1

You assemble the package

The owner completes and forwards the Property Improvement Form, the application fee, a Neighbor Awareness Form, three sets of plans, contractor insurance / license / permits, scope of work with dates, and a construction schedule.

2

FirstService Residential logs it

You receive a proof-of-receipt statement, and the management company forwards the complete package to the Architectural Committee.

3

An architect or consultant reviews

The AC may have a design professional review the plans as it deems necessary. For complex projects (pools, additions) an extra consultant fee may apply, at the owner’s expense.

4

The Committee decides

The AC has up to forty-five days to review and approve, deny, or request more information.
45-day review window

5

You get the decision in writing

Approved? You receive a stamped copy of the form and approved plans. Denied? You get the form and denied plans back, and may appeal to the Board in writing within thirty days.

The Submittal Package

What goes in the envelope.

Submit applications to the property management company. Incomplete packages get returned — there’s no charge to resubmit, but it costs you time.

  • 1Property Improvement FormExhibit A, fully completed.
  • 2$150 application feeCheck made out to the Association.
  • 3Plans & specifications — 3 copiesOne copy is returned to you; Deerlake Ranch retains two.
  • 4Neighbor Awareness FormExhibit B, one copy — shown to adjacent, facing & impacted neighbors for signature.
  • 5Color photographs — 2 copiesWhere applicable. Photos are not returned.

What your plans must show

Drawn to scale — 1/8″ = 1′0″ on 24″×36″ is preferred, and must be legible.

  • Landscape plans with location, type, size & quantity of every plant (a plant list alone isn’t enough)
  • Grading / drainage plans where the established drainage pattern may change
  • The nature, shape, dimensions, materials, color & finish of every proposed improvement
  • Material samples or color photographs of the proposed color scheme
  • A dimensioned hardscape plan for new paving, walls, fences, patio covers & drainage
No Approval Needed

Pre-approved improvements.

A short list of changes you can make without an Architectural Committee application — as long as you follow the conditions exactly.

Pre-approved

Replacing exterior lighting with an identical light fixture.

Pre-approved

Window coverings that can’t be seen from outside the residence.

Pre-approved

Visible window coverings, if a uniform neutral color that harmonizes with the exterior.

Pre-approved

White or natural wood shutters on the inside of the residence.

Pre-approved

Retractable screen doors with a frame painted to match the residence.

Pre-approved

Replacement plantings that aren’t invasive and stay under 3′ at maturity; irrigation under a foot above ground.

Pre-approved

Repainting or repairing with paint & materials identical to the original or approved ones.

General Design Standards

The rules, by category.

These are the standards the Committee measures every project against. Tap any card to see the specific rules. This is a working summary — the recorded Architectural Guidelines and the Community Character Statement govern.

After Approval

Variances, appeals & finishing the job.

Variances & Appeals

When the standard rules don’t fit your lot.

  • Variances — the Board may authorize exceptions to height, size, floor-area or placement rules when topography, natural obstructions, or aesthetic / environmental factors require. Request in writing, stating the reason; if granted, it’s signed by two officers.
  • Appeals — if your application is denied, you may appeal to the Board in writing within thirty days of the AC’s final decision. The Board hears it at its next meeting.

Completion of Work

Closing out an approved project.

  • Work other than landscaping or window coverings must begin within one year of approval.
  • Build consistent with the approved package — any deviation needs AC review before you proceed.
  • Submit a Notice of Completion (Exhibit C) with photographs within thirty days of finishing.
  • The AC may inspect; its right to flag noncompliance ends sixty days after it receives your written notice of completion.
Chatsworth Landscape

We handle the whole approval, start to finish.

From the planting plan and the Property Improvement Form to the Neighbor Awareness signatures and the final Notice of Completion — we design landscapes that clear the Architectural Committee the first time.

Forms & submittals through FirstService Residential · (877) 391-3955